Access Contracting Limited
Unit 34, Jessops Riverside
800 Brightside Lane, Sheffield S9 2RX
Tel: 0114 256 1197 Fax: 0114 242 2440

Tel 0114 256 1197
Skip navigation

10/3/2015 SAEMA - New document downloadable follow the link below

This document has been prepared to assist duty holders (e.g. facilities managers, building owners, main contractors and other persons acting as “duty holder” for provision of temporarily and permanently installed suspended façade access systems, who may

The aim of this document is to provide some guidance to assist with possibleactions and planning in the case of mechanical / electrical breakdown andrescue planning for facade access equipment. Duty holders have a responsibility for having a rescue plan in place (WAHR:2005,regulation 4, all work at height should be properly planned, this planning should include planning for rescue).

This responsibility cannot be transferred to the equipment users however their Risk Assessment and Method statement documentation should incorporate their means of following the rescue plan and reducing any remaining risk´s.

http://www.saema.org/publications/

 

Back